The National Bureau of Standards Boulder Laboratories at Boulder, Colorado once again served as the host for the 1972 Cryogenic Engineering Conference. For the Cryogenic Engineering Conference it was like coming horne, for it was at the NBS Boulder Laboratories that the Cryogenic Engineering Conference was first conceived and held m 1954m connection with the dedication ofthe NBS Boulder Laboratories by President Dwight D. Eisenhower. The Cryogenic Engineering Conference IS grateful for the continuing support that the National Bureau of Standards has gIVen over the years, and which was expanded on July 1, 1971 when the NBS Boulder Laboratories assumed the secretariat function of the Conference from the National Academy of Sciences. Because of common interests in heat transfer, the 1972 Cryogemc Engineering Conference worked with the 13th National Heat Transfer Conference to develop a joint program m heat transfer. A majority ofthe papers presented in this cooperative effort are incIuded m V olume 18 of the Advances zn Cryogenic Engineerzng through the kmd permission ofthe 13th NatIOnal Heat Transfer Conference and are acknowl edged accordingly.
- ISBN:
- 9781468431131
- 9781468431131
-
Category:
- Mechanical engineering
- Format:
- Paperback
- Publication Date:
-
11-09-2013
- Publisher:
- Springer-Verlag New York Inc.
- Country of origin:
- United States
- Pages:
- 533
- Dimensions (mm):
- 254x178x28mm
- Weight:
- 1.04kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: