Free shipping on orders over $99
Clean Energy from Waste

Clean Energy from Waste

Fundamental Investigations on Ashes and Tar Behaviours in a Two Stage Fluid Bed-Plasma Process for Waste Gasification

by Massimiliano Materazzi
Hardback
Publication Date: 24/02/2017

Share This Book:

  $254.87
or 4 easy payments of $63.72 with
afterpay
This item qualifies your order for FREE DELIVERY
This book explores the use of recent advanced multiple stage conversion technologies. These applications combine conventional fluidised bed systems with new plasma technologies to efficiently generate different energy outputs from waste materials with minimum cleaning effort. Using a mix of modelling and experimental approaches, the author provides fundamental insights into how the key operating variables of the two-stage process may impact the final quality of syngas. This thesis serves as a useful reference guide on the modelling and design of single and multiple-stage systems for thermal waste treatment. Its extended section on plant configuration and operation of waste gasification plants identifies the main technical challenges, and is of use to researchers entering the field.
ISBN:
9783319468693
9783319468693
Category:
Industrial chemistry
Format:
Hardback
Publication Date:
24-02-2017
Publisher:
Springer International Publishing AG
Country of origin:
Switzerland
Pages:
231
Dimensions (mm):
235x155x16mm
Weight:
5.15kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro  2 working days

NSW Metro  2 working days

NSW Rural  2 - 3 working days

NSW Remote  2 - 5 working days

NT Metro  3 - 6 working days

NT Remote  4 - 10 working days

QLD Metro  2 - 4 working days

QLD Rural  2 - 5 working days

QLD Remote  2 - 7 working days

SA Metro  2 - 5 working days

SA Rural  3 - 6 working days

SA Remote  3 - 7 working days

TAS Metro  3 - 6 working days

TAS Rural  3 - 6 working days

VIC Metro  2 - 3 working days

VIC Rural  2 - 4 working days

VIC Remote  2 - 5 working days

WA Metro  3 - 6 working days

WA Rural  4 - 8 working days

WA Remote  4 - 12 working days

Reviews

Be the first to review Clean Energy from Waste.