Free shipping on orders over $99
Coupling Power Generation with Syngas-Based Chemical Synthesis

Coupling Power Generation with Syngas-Based Chemical Synthesis

A Process Chain Evaluation from a Power Plant Viewpoint

by Clemens Forman
Paperback
Publication Date: 15/07/2018

Share This Book:

  $111.38
or 4 easy payments of $27.84 with
afterpay
This item qualifies your order for FREE DELIVERY
Coupling power generation with syngas-based chemical synthesis according to the so-called 'Polygeneration-Annex' concept offers economic and technical benefits. Clemens Forman assesses the integration of incoming streams by the Annex plant from a power plant point of view across its full load range. Analyses are done by load-dependent flowsheet simulation. The pulverized lignite combustion power plant process is covered by two generic technical states: an existing 650 MW(el) power plant and a near future 1,100 MW(el) power plant with duo block design and dry lignite co-firing. Modeling comprises both the flue gas path and the water-steam circuit. Appropriate stream interfaces are identified and determined depending on the load status. The technical feasibility of integration can be proven.
ISBN:
9783658226084
9783658226084
Category:
Electrical engineering
Format:
Paperback
Publication Date:
15-07-2018
Publisher:
Springer Fachmedien Wiesbaden
Country of origin:
Germany
Pages:
147
Dimensions (mm):
210x148mm
Weight:
0.45kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro  2 working days

NSW Metro  2 working days

NSW Rural  2 - 3 working days

NSW Remote  2 - 5 working days

NT Metro  3 - 6 working days

NT Remote  4 - 10 working days

QLD Metro  2 - 4 working days

QLD Rural  2 - 5 working days

QLD Remote  2 - 7 working days

SA Metro  2 - 5 working days

SA Rural  3 - 6 working days

SA Remote  3 - 7 working days

TAS Metro  3 - 6 working days

TAS Rural  3 - 6 working days

VIC Metro  2 - 3 working days

VIC Rural  2 - 4 working days

VIC Remote  2 - 5 working days

WA Metro  3 - 6 working days

WA Rural  4 - 8 working days

WA Remote  4 - 12 working days

Reviews

Be the first to review Coupling Power Generation with Syngas-Based Chemical Synthesis.