This book describes the latest microeconomic concepts and operations research (OR) techniques needed to comprehend the design and operation of power markets, as well as the actions of their agents: producers, consumers, operators, and regulators. This is critical when it comes to addressing a constantly evolving power system environment that incorporates an increasing number of no-marginal-cost renewable sources, increasingly competitive storage facilities, increasingly responsive demands, and widespread communication channels that allow distributed decision-making. Such evolving environments call for a re-examination of the microeconomic concepts and OR techniques required by graduate students and practitioners in the electric energy field.
This accessible, tutorial-style book features numerous illustrative examples to help readers grasp the economic concepts and OR procedures used by power market professionals. The authors explian these concepts and procedures and present a vision of a renewable-dominated marketplace. Each chapter also includes exercises.
- ISBN:
- 9783030928704
- 9783030928704
-
Category:
- Operational research
- Format:
- Hardback
- Publication Date:
-
29-04-2022
- Publisher:
- Springer Nature Switzerland AG
- Country of origin:
- Switzerland
- Pages:
- 317
- Dimensions (mm):
- 235x155mm
- Weight:
- 0.66kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 1 - 2 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: