"Green Stormwater Infrastructure for Sustainable Urban and Rural Development" offers some of the latest international scientific and practitioner findings around the adaptation of urban, rural and transportation infrastructures to climate change by sustainable water management. This book addresses the main gaps in the up-to-date literature and provides the reader with a holistic view, ranging from a strategic and multiscale planning, implementation and decision-making angle down to the engineering details for the design, construction, operation and maintenance of green stormwater techniques such as sustainable drainage systems (SuDS) and stormwater control measures (SCMs). This book is particularly recommended for a wide audience of readers, such as academics/researchers and students in the fields of architecture and landscaping, engineering, environmental and natural sciences, social and physical geography and urban and territorial planning. This book is also a resource for practitioners and professionals developing their work in architecture studios, engineering companies, local and regional authorities, water and environmental industries, infrastructure maintenance, regulators, planners, developers and legislators.
- ISBN:
- 9783036506104
- 9783036506104
-
Category:
- Chemistry
- Format:
- Hardback
- Publication Date:
-
22-04-2021
- Publisher:
- Mdpi AG
- Pages:
- 220
- Dimensions (mm):
- 244x170x19mm
- Weight:
- 0.68kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 1 - 2 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: