Transition-metal catalyzed X-H insertions from alpha-diazocarbonyl compounds represent one of the most efficient approaches to form C--X bonds. The presented thesis is based on the synthesis and application of alpha-diazocarbonyl compounds in metal-catalyzed N-H insertion and the chemoenzymatic synthesis of heterocycles via a Cu]/ Rh] catalyzed intramolecular O-H insertion. In the first part, a straightforward approach via the Wittig reaction, gamma-Umpolung addition and diazo transfer reaction allowed the synthesis of unsaturated alpha-diazocarbonyl compounds with ease. In the second part, the newly synthesized (R textsubscript{p)-pseudo-ortho 2.2]paracyclophane-based bisoxazoline ligands presented superior reactivity. The obtained delta-amino alpha, beta-unsaturated carboxylic esters were used to synthesize hexahydroindoles, which are key intermediates in the synthesis route of Rostratin B-D. Additional investigation of alpha-diazocarbonyl compounds led to the enzymatic synthesis of O-Heterocycles. With the employment of enantiopure starting material obtained from ketoreductase LbADH, the enantioselectivity of each diastereomer from the O-H insertion product have been effectivity improved.
- ISBN:
- 9783832548643
- 9783832548643
-
Category:
- Chemistry
- Format:
- Paperback
- Publication Date:
-
15-03-2019
- Language:
- English
- Publisher:
- Logos Verlag Berlin
- Country of origin:
- Germany
- Dimensions (mm):
- 210.06x145.03mm
- Weight:
- 0.53kg
This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 3 - 5 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: