Free shipping on orders over $99
Model Based Approach for Energy and Resource Efficient Machining Systems

Model Based Approach for Energy and Resource Efficient Machining Systems

by Nadine Madanchi
Hardback
Publication Date: 10/12/2021

Share This Book:

  $219.00
or 4 easy payments of $54.75 with
afterpay
This item qualifies your order for FREE DELIVERY
This book provides a concept to analyze and increase the energy and resource efficiency of machining systems. Machining systems are widely used to produce workpieces in large quantities and with complex geometrical shapes. These systems, however, are also relevant in terms of energy and resource consumption, which is strongly connected to the choice of cutting fluid strategy. Within the focus of the concept, cutting fluid connects the elements of the machining system and results in interactions between them. Based on this description and an extensive literature review, a modeling approach is developed that comprises the relations between process parameters, cutting fluid strategies, and relevant machining system elements. The performance of the machining system is assessed with regard to environmental, economic as well as technological indicators and improved by various organizational and technical measures. The exemplary application of the developed concept is carried out in the context of two case studies and also indicates the corresponding effects of improvement measures.
ISBN:
9783030875398
9783030875398
Category:
Production engineering
Format:
Hardback
Publication Date:
10-12-2021
Publisher:
Springer Nature Switzerland AG
Country of origin:
Switzerland
Pages:
177
Dimensions (mm):
235x155mm
Weight:
0.47kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 1 - 2 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Model Based Approach for Energy and Resource Efficient Machining Systems.