A guide to the architecture that gives British railways their identity, from stations to signal boxes. Roots of Britain's railways lie in the wooden-railed colliery wagonways of around 1600, but it was almost 1830 before specific railway architecture became needed. This evolved rapidly down to 1850, and for some time afterwards Britain led the world in designing passenger stations. Though stylistic dress followed contemporary fashions, their handling of space and of large crowds of people was something quite new. Glass and iron were used to produce elegant platform roofs, many exploiting the decorative potential of cast iron. However, the most striking contribution was made by the great arched station sheds, often seen as the 19th century's counterpart to medieval cathedrals. Between the 20th century's two world wars, architectural progress on Britain's railways was largely confined to London Transport, but the last few decades have seen a renewal of confidence and investment, matched by some interesting new buildings.
- ISBN:
- 9780747814450
- 9780747814450
-
Category:
- Industrial / commercial art & design
- Format:
- Paperback
- Publication Date:
-
10-01-2015
- Language:
- English
- Publisher:
- Bloomsbury Publishing PLC
- Country of origin:
- United Kingdom
- Dimensions (mm):
- 210.01x149x5mm
- Weight:
- 0.15kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 1 week of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: