Free shipping on orders over $99
System Design Optimization for Product Manufacturing

System Design Optimization for Product Manufacturing

by Masataka Yoshimura
Paperback
Publication Date: 20/10/2014

Share This Book:

  $169.00
or 4 easy payments of $42.25 with
afterpay
This item qualifies your order for FREE DELIVERY
Readers of System Design Optimization for Product Manufacturing will learn about detailed concepts and practical technologies that enable successful product design and manufacture. These concepts and technologies are based on system optimization methodologies that consider a broad range of mechanical, as well as human, factors.


System Design Optimization for Product Manufacturing explains the methodologies behind current and future product manufacture. Its detailed explanations of key concepts are relevant not only for product design and manufacture, but also for other business fields. These core concepts and methodologies can be applied to practically any field where informed decision-making is important, and where a range of often conflicting factors must be carefully weighed and considered.


System Design Optimization for Product Manufacturing can be used as a fundamental reference book by both engineers and students in the fields of manufacturing, design engineering, and product development.
ISBN:
9781447157892
9781447157892
Category:
Tool making
Format:
Paperback
Publication Date:
20-10-2014
Publisher:
Springer London Ltd
Country of origin:
United Kingdom
Pages:
200
Dimensions (mm):
235x155x12mm
Weight:
0.45kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review System Design Optimization for Product Manufacturing.