Roads are essential for sustainability, the development of resilient transportation networks being one of the Sustainable Development Goals (SDG) for the UN's 2030 Agenda.
There is a need for new visions to improve the efficiency and resilience of infrastructures, prioritizing investments and considering several aspects that can be simplified in KPIs such as in the acronym RAMSSHE P, which stands for Reliability, Availability, Maintainability, Safety, Security, Health, Environment, Economics, and Politics. Topics related to toad sustainability include:
Predictive maintenance to infer the condition rating (CR) to forecast asset deterioration during the whole lifecycle of the infrastructure;
The need for a focus on Sustainability, fostering recycling and reuse of materials;
Need for improving circularity through the large valorization potential of construction and demolition (C&D) waste;
Fostering digital transition in infrastructure management through BIM as an information model that represents the physical and attribute elements of construction;
Exploring information models for high-value applications from the design, all the way to the final demolition.
- ISBN:
- 9783036549637
- 9783036549637
-
Category:
- Environmental science
- Format:
- Hardback
- Publication Date:
-
01-11-2022
- Publisher:
- Mdpi AG
- Pages:
- 102
- Dimensions (mm):
- 244x170x11mm
- Weight:
- 0.43kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 1 - 2 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: