In nuclear fusion technology, thermal-hydraulics is a key discipline employed in the design phase of the systems and components to demonstrate performance, and to ensure the reliability and their efficient and economical operation. ITER is in charge of investigating the transients of the engineering systems; this included safety analysis. The thermal-hydraulics is required for the design and analysis of the cooling and ancillary systems such as the blanket, the divertor, the cryogenic, and the balance of plant systems, as well as the tritium carrier, extraction and recovery systems.
This Special Issue collects and documents the recent scientific advancements which include, but are not limited to: thermal-hydraulic analyses of systems and components, including magneto-hydrodynamics; safety investigations of systems and components; numerical models and code development and application; codes coupling methodology; code assessment and validation, including benchmarks; experimental infrastructures design and operation; experimental campaigns and investigations; scaling issue in experiments.
- ISBN:
- 9783036530321
- 9783036530321
-
Category:
- Technology: general issues
- Format:
- Hardback
- Publication Date:
-
17-02-2022
- Publisher:
- Mdpi AG
- Pages:
- 424
- Dimensions (mm):
- 244x170x33mm
- Weight:
- 1.11kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 1 - 2 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: