Free shipping on orders over $99
The Silver Bridge Disaster of 1967

The Silver Bridge Disaster of 1967

by Ruth FoutMartha Fout Bridget J. Gromek and others
Paperback
Publication Date: 01/10/2012

Share This Book:

  $47.25
or 4 easy payments of $11.81 with
afterpay
Point Pleasant's Silver Bridge, the first eyebar suspension bridge in the United States, was an engineering marvel when it was constructed in 1927 and 1928. Located on US Highway 35, the bridge spanned the Ohio River and linked Point Pleasant, West Virginia, with the towns of Kanauga and Gallipolis, Ohio. For almost 40 years, the structure provided dependable service for travelers in the region. On December 15, 1967, this service came to a dramatic and disastrous end. At 4:58 p.m., during the height of rush hour, the bridge suddenly collapsed. Rescue and recovery operations started immediately but were hampered by poor weather conditions and freezing rain. The cause of the collapse was linked to the bridge's innovative design. Undetected corrosion stress cracks caused an eyebar on the Ohio side to fracture; because the eyebars were linked together in a chain, the failure of one led to the catastrophic collapse of the entire bridge. In total, 46 lives were lost in the disaster.
ISBN:
9780738592787
9780738592787
Category:
History of the Americas
Format:
Paperback
Publication Date:
01-10-2012
Language:
English
Publisher:
Arcadia Publishing
Country of origin:
United States
Pages:
127
Dimensions (mm):
229x159x8mm
Weight:
0.29kg

This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 3 - 5 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review The Silver Bridge Disaster of 1967.