1st International Workshop on Enterprise Modeling (ENMO14).- Preface to ENMO 2014.- Model Based Enterprise Simulation and Analysis: A Pragmatic Approach Reducing the Burden on Experts.- 3D vs. 4D Ontologies in Enterprise Modeling.- Applications of Ontologies in Enterprise Modelling: A Systematic Mapping Study.- 2nd International Workshop on Modeling and Management of Big Data (MoBiD14).- Preface to MoBiD 2014.- Extracting Value from Big Data.- A Semi-clustering Scheme for High Performance PageRank on Hadoop.- Energy Consumption Prediction by Using an Integrated Multidimensional Modeling Approach and Data Mining Techniques with Big Data.- Benchmarking Performance for Migrating a Relational Application to a Parallel Implementation.- A Data Quality in Use Model for Big Data.- Business Intelligence and Big Data in the Cloud: Opportunities for Design-Science Researchers.- From Business Intelligence to Semantic Data Stream Management.- 1st International Workshop on Conceptual Modeling.- in Requirements and Business Analysis (MReBA14).- Preface to MReBA 2014.- Understandability of Goal Concepts by Requirements Engineering Experts.- On the Definition of Self-service Systems.- Semantic Monitoring and Compensation in Socio-technical Processes.- Modeling Regulatory Compliance in Requirements Engineering.- Automated Completeness Check in KAOS.- Practical Goal Modeling for Enterprise Change Context: A Problem Statement.- 1st International Workshop on Quality of Models and Models of Quality (QMMQ14).- Preface to QMMQ 2014.- A Superstructure for Models of Quality.- A Quality Management Workflow Proposal for a Biodiversity Data Repository.- Applying a Data Quality Model to Experiments in Software Engineering.- Towards Indicators for HCI Quality Evaluation Support.-8th International Workshop on Semantic and Conceptual Issues in GIS (SeCoGIS14).- Preface to SeCoGIS 2014.- Towards a Qualitative Representation of Movement.- Lagrangian Xgraphs: A Logical Data-Model for Spatio-Temporal Network Data: A Summary.- Efficient Reverse kNN Query Algorithm on Road Network Distances Using Partitioned Subgraphs.- Using the Model-Driven Architecture Approach for Geospatial Databases Design of Ecological Niches and Potential Distributions.- OMT-G Designer: A Web Tool for Modeling Geographic Databases in OMT-G.- A Model of Aggregate Operations for Data Analytics over Spatiotemporal Object.- 11th International Workshop on Web Information Systems Modeling (WISM14).- Preface to WISM 2014.- Natural Language Processing for Linking Online News and Open Government Data.- Enterprise Linked Data: A Systematic Mapping Study.- Ontology Population from Web Product Information.- Service Adaptability Analysis across Semantics and Behavior Levels Based on Model Transformation.- Prioritizing Consumer-Centric NFPs in Service Selection.- ER'14 Demonstrations.- Personal eHealth Knowledge Spaces though Models, Agents and Semantics.- Lightweight Semantic Prototyper for Conceptual Modeling.- SQTime: Time-Enhanced Social Search Querying.
- ISBN:
- 9783319122557
- 9783319122557
-
Category:
- Information technology: general issues
- Format:
- Paperback
- Publication Date:
-
29-09-2014
- Language:
- English
- Publisher:
- Springer
- Country of origin:
- United States
- Dimensions (mm):
- 235x155mm
- Weight:
- 5.04kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro 2 working days
NSW Metro 2 working days
NSW Rural 2 - 3 working days
NSW Remote 2 - 5 working days
NT Metro 3 - 6 working days
NT Remote 4 - 10 working days
QLD Metro 2 - 4 working days
QLD Rural 2 - 5 working days
QLD Remote 2 - 7 working days
SA Metro 2 - 5 working days
SA Rural 3 - 6 working days
SA Remote 3 - 7 working days
TAS Metro 3 - 6 working days
TAS Rural 3 - 6 working days
VIC Metro 2 - 3 working days
VIC Rural 2 - 4 working days
VIC Remote 2 - 5 working days
WA Metro 3 - 6 working days
WA Rural 4 - 8 working days
WA Remote 4 - 12 working days
Share This Book: