Free shipping on orders over $99
Applied Civil Engineering Risk Analysis

Applied Civil Engineering Risk Analysis

by Robb Eric S. Moss
Paperback
Publication Date: 16/08/2020

Share This Book:

  $84.99
or 4 easy payments of $21.25 with
afterpay
This updated edition retains its introduction to applied fundamental statistics, probability, reliability, and decision theory as these pertain to problems in Civil Engineering. The new edition adds an expanded treatment of systems reliability, Bayesian methods, and spatial variabililty, along with additional example problems throughout. The book provides readers with the tools needed to determine the probability of failure, and when multiplied by the consequences of failure, illustrates how to assess the risk of civil engineering problems. Presenting methods for quantifying uncertainty that exists in engineering analysis and design, with an emphasis on fostering more accurate analysis and design, the text is ideal for students and practitioners of a range of civil engineering disciplines.





Expands on the class-tested pedagogy from the first edition with more material and more examples;
Broadens understanding with simulations coded both in Matlab and in R;
Features new chapters on spatial variability and Bayesian methods;
Emphasizes techniques for estimating the influence of uncertainty on the probability of failure
ISBN:
9783030226824
9783030226824
Category:
Civil engineering
Format:
Paperback
Publication Date:
16-08-2020
Publisher:
Springer Nature Switzerland AG
Country of origin:
Switzerland
Edition:
2nd Edition
Pages:
180
Dimensions (mm):
235x155mm
Weight:
0.3kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Applied Civil Engineering Risk Analysis.