Changes in the Industry; C.J. Landen. Session One: High Pressure/High Temperature; Chairman: C.P. Ellinas. Dunbar Double Wall Insulated Pipeline; D. Popineau. Subsea Pipelines Rated at less than Wellhead Shut-In Pressure; D. Bayly. The Strathspey Pipeline Warm Up System -- Design Philosophy & Operating Experience; G. Banner. Session Two: Design; Chairman: P. Brown. Bending of Pipelines to High Levels of Strain; A.C. Walker, D.P. Ellinas. A Critical Review of Near-Shore and Landfall Pipeline Design and Construction; T. Sriskandrajah, J.H. Watkins, E.A. David. Description of a Test on a Novel Reel Lay Facility; M. Seeley, T. Welsh, K. Williams. Guidelines for Free Spanning Pipelines: Outstanding Items and Technology Innovation; F. Tura, M.B. Bryndum, N.J.R. Nielsen. Upheaval Buckling of Flexible Pipes; S.A. Lotvelt, P. Bryn. Session Three: Construction/Installation; Chairman: P. Rosier. Remote Connection Systems for Subsea Pipeline Tie-Ins and Repairs; D. Cruickshank, P. Maxted. ROV Assisted Geotechnical Investigation of Pipeline Trench Back Fill Material Aids Design of Tordis to Gullfaks `C' Pipeline; P.T. Power, R.A. Hawkins, H.P. Christophersen, I. McKenzie. New Burial Techniques for Effective Cable Burial and Protection of Pipes; I.D. Bonnon. Application of a High Resolution Seismic Refraction Equipment to the Precise Investigations of Subbottom Materials along Subsea Pipeline Routes; F. Cour, J.F. Nauroy, J. Meunier. Hydrodynamic Excavation -- Recent Experience in Pipeline and Cable De-Burial, Trenching and Backfilling and Large Scale Seabed Site Clearance; N.V. Sills. Session Four: Operations and Maintenance; Chairman: B.A. Jones. In Service Monitoring of Pipelines with the Geopig Geometry Survey Tool and Associated Pipeline Database System; J. Bruce. Through-Life Monitoring of Pipelines; J.H.A. Baker. Technological Advances in Pipeline Isolation and Repair; A. Aldeen. Underwater Pipeline Repair: Problems and Solutions; N. Wright, B.A. Jones. Developments in Subsea Pipe Freezing for Deep Water Applications; A.J. Barden, R. Standen.
- ISBN:
- 9780792328223
- 9780792328223
-
Category:
- Offshore engineering
- Format:
- Hardback
- Publication Date:
-
30-04-1994
- Publisher:
- Kluwer Academic Publishers
- Country of origin:
- United States
- Pages:
- 256
- Weight:
- 0.58kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: