The book summarizes the findings and contributions of the European ARTEMIS project, CESAR, for improving and enabling interoperability of methods, tools, and processes to meet the demands in embedded systems development across four domains - avionics, automotive, automation, and rail.
The contributions give insight to an improved engineering and safety process life-cycle for the development of safety critical systems. They present new concept of engineering tools integration platform to improve the development of safety critical embedded systems and illustrate capacity of this framework for end-user instantiation to specific domain needs and processes. They also advance state-of-the-art in component-based development as well as component and system validation and verification, with tool support. And finally they describe industry relevant evaluated processes and methods especially designed for the embedded systems sector as well as easy adoptable common interoperability principles for software tool integration.
- ISBN:
- 9783709113868
- 9783709113868
-
Category:
- Reliability engineering
- Format:
- Hardback
- Publication Date:
-
09-04-2013
- Language:
- English
- Publisher:
- Springer Verlag GmbH
- Country of origin:
- Austria
- Pages:
- 391
- Dimensions (mm):
- 235x155x23mm
- Weight:
- 7.33kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 1 - 2 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: