During the mid-1960s, BR was looking to introduce a high-powered diesel loco to improve services on the West Coast Main Line. Although the new Class 47s would have perhaps been the first choice, these were already proving unreliable and suffered regular engine failures. Subsequently, BR opted to lease 50 locomotives from English Electric instead. Initially known as English Electric Type 4s, the locos were purchased outright by BR at the end of the lease and became known as Class 50s.When Class 50s were introduced onto Britain's railways, they were regarded as poor substitutes for the beloved Western Region diesel hydraulics they were sent to replace. However, as time went on, they impressed more and more. In fact, towards the end of their careers, they developed a following not unlike the last days of the hydraulics, with many enthusiasts clamoring to photograph or ride behind them. The interest in the class is still evident to this day, with as many as 18 still surviving in various states of repair. Including over 200 images, this volume shows the class at work around the UK, covering not only the BR era, but also subsequent years.
- ISBN:
- 9781802822588
- 9781802822588
-
Category:
- Trains & railways: general interest
- Format:
- Paperback
- Publication Date:
-
30-03-2023
- Language:
- English
- Publisher:
- Key Publishing
- Country of origin:
- Czech Republic
- Dimensions (mm):
- 243.08x169.93mm
This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: