This book addresses disaster and disaster risk reduction (DRR) practices, constraints and capacity in the context of coastal Bangladesh.
Located in the lower riparian of the Bay of Bengal, Bangladesh has to face frequent disasters such as floods, cyclones, river erosion, salinity intrusion as well as drought. Drawing together a range of multidisciplinary perspectives, Coastal Disaster Risk Management in Bangladesh explores the connection between climate change and DRR issues in this region. The editors reorganize disaster studies around social and physical changes that can reduce these risks and put at risk populations on a stronger footing by making risk reduction the focus. These include measures to improve disaster preparedness, to boost recovery by creating better disaster planning and programs, and physical and social initiatives to improve disaster resilience. Also, analyzing the gender perspective, the volume also utilizes the local knowledge framework to consider whether these populations have resilient knowledge that needs to be incorporated into initiatives based on advanced technology and perspectives.
This book will be of interest to academics, researchers, students, policymakers and practitioners in the field of disaster, DRR and governance, climate change, climate change adaptation (CCA) and the environment.
- ISBN:
- 9781032182216
- 9781032182216
-
Category:
- Environmental monitoring
- Format:
- Hardback
- Publication Date:
-
31-03-2023
- Publisher:
- Taylor & Francis Ltd
- Country of origin:
- United Kingdom
- Pages:
- 506
- Dimensions (mm):
- 234x156mm
- Weight:
- 0.45kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: