Safety and security are crucial to the operations of nuclear power plants, but cyber threats to these facilities are increasing significantly. Instrumentation and control systems, which play a vital role in the prevention of these incidents, have seen major design modifications with the implementation of digital technologies. Advanced computing systems are assisting in the protection and safety of nuclear power plants; however, significant research on these computational methods is deficient. Cyber Security and Safety of Nuclear Power Plant Instrumentation and Control Systems is a pivotal reference source that provides vital research on the digital developments of instrumentation and control systems for assuring the safety and security of nuclear power plants. While highlighting topics such as accident monitoring systems, classification measures, and UAV fleets, this publication explores individual cases of security breaches as well as future methods of practice. This book is ideally designed for engineers, industry specialists, researchers, policymakers, scientists, academicians, practitioners, and students involved in the development and operation of instrumentation and control systems for nuclear power plants, chemical and petrochemical industries, transport, and medical equipment.
- ISBN:
- 9781799832775
- 9781799832775
-
Category:
- Nuclear power & engineering
- Format:
- Hardback
- Publication Date:
-
30-09-2020
- Language:
- English
- Publisher:
- IGI Global
- Country of origin:
- United States
- Dimensions (mm):
- 279.4x215.9mm
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: