Line design is a very specialized field involving spatial constraints, high performance conductors, lightning protection, cable vibrations, digital terrain surveying, Fiber optic communication wires along with some exciting software developments over the past two decades. In the West, billions of dollars are being invested on building new lines and the so-called "Smart Grid". This book will cover electrical and mechanical characteristics associated with high-voltage transmission lines, selection of conductors, line layout, thermal ratings, plan and profile drawing among other things. Structures are only one component of a transmission line; as such, this book will form a companion volume to the book on structures and foundations.
The book is aimed at students, practicing engineers, technicians and linemen, researchers and academics. It will contain beneficial information to those involved in the management and maintenance of high voltage transmission lines and associated component systems. For those in academia, it will be an adequate textbook for (under)graduate courses centering on the topic. Asset managers at utilities and state-level electrical corporations should find the book a useful reference work during system and line maintenance operations.
- ISBN:
- 9781138000926
- 9781138000926
-
Category:
- Environmental science
- Format:
- Hardback
- Publication Date:
-
05-01-2026
- Publisher:
- Taylor & Francis Ltd
- Country of origin:
- United Kingdom
- Pages:
- 500
- Dimensions (mm):
- 246x174mm
This title is not yet published. It is available for purchase now and should arrive at our Sydney warehouse from our Australian supplier within 1 week of the release date listed above.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: