Involving several areas of geological engineering, geotechnical engineering and tunnel engineering, this book describes the soft soil deformation characteristics and dynamic responses induced by subway vibration load. Based on field monitoring and laboratory testing data, with both comprehensive micro-and macroanalysis, the authors present dynamic characteristics and deformation settlement of saturated soft clay surrounding subway tunnels using dynamic and static methodology. Mechanism of deformation, failure in microstructure of soft clay soil, dynamic response, macro deformation and settlement are all discussed and analyzed thoroughly and systematically. Some of the research findings in this book have been widely applied by large subway companies and will have broader application prospects in future. All the above make this book a valuable reference not only for technical engineers working in subway design or construction but also for advanced graduate students. Prof. Yiqun Tang works at the Department of Geotechnical Engineering, Tongji University, Shanghai, China.
- ISBN:
- 9783642419867
- 9783642419867
-
Category:
- Earth sciences
- Format:
- Hardback
- Publication Date:
-
22-01-2014
- Language:
- English
- Publisher:
- Springer-Verlag Berlin and Heidelberg GmbH & Co. KG
- Country of origin:
- Germany
- Pages:
- 241
- Dimensions (mm):
- 235x155x20mm
- Weight:
- 5.75kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: