Free shipping on orders over $99
Foundation Systems for High-Rise Structures

Foundation Systems for High-Rise Structures

by Rolf KatzenbachSteffen Leppla and Deepankar Choudhury
Paperback
Publication Date: 16/01/2019

Share This Book:

33%
OFF
RRP  $81.99

RRP means 'Recommended Retail Price' and is the price our supplier recommends to retailers that the product be offered for sale. It does not necessarily mean the product has been offered or sold at the RRP by us or anyone else.

$55.50
or 4 easy payments of $13.87 with
afterpay
The book deals with the geotechnical analysis and design of foundation systems for high-rise buildings and other complex structures with a distinctive soil-structure interaction. The basics of the analysis of stability and serviceability, necessary soil investigations, important technical regulations and quality and safety assurance are explained and possibilities for optimised foundation systems are given. Additionally, special aspects of foundation systems such as geothermal activated foundation systems and the reuse of existing foundations are described and illustrated by examples from engineering practice.
ISBN:
9780367139049
9780367139049
Category:
Structural engineering
Format:
Paperback
Publication Date:
16-01-2019
Publisher:
Taylor & Francis Ltd
Country of origin:
United Kingdom
Pages:
298
Dimensions (mm):
234x156mm
Weight:
0.45kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 5 - 7 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Foundation Systems for High-Rise Structures.