The process of modelling hardware involves a certain duality: a model may specify and represent the desires and constraints of the designer, or it may imitate something that already exists, and can end in simulation or documentation. One of the main qualities of a specification formalism is its ability to ignore issues that do not belong to this level. Such formalisms are obviously intended for the first stages of a design, but can also be used in the process of redesign. Having a proper level of description thus avoids two symmetric problems: overspecification, which would introduce new instances of the hardware constraints that were only meaningful to the previous ones; and underspecification, which would lead to unnecessary work and sometimes to starting again from scratch. Describing recent progress in specification formalisms in electronic design, this work provides an overview of object-oriented methodologies. It goes on to highlight several formalisms such as VSPEC, ESTELLE, SDL and LOTOS with methods that map their semantics to simulatable or synthesizable VHDL.
- ISBN:
- 9780792396321
- 9780792396321
-
Category:
- Systems analysis & design
- Format:
- Hardback
- Publication Date:
-
30-09-1995
- Language:
- English
- Publisher:
- Kluwer Academic Publishers
- Country of origin:
- United States
- Pages:
- 162
- Dimensions (mm):
- 235x155x13mm
- Weight:
- 0.45kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: