Free shipping on orders over $99
Impact of Improved Operation and Maintenance on Cohesive Sediment Transport in Gezira Scheme, Sudan

Impact of Improved Operation and Maintenance on Cohesive Sediment Transport in Gezira Scheme, Sudan

by Ishraga S. Osman
Paperback
Publication Date: 17/10/2015

Share This Book:

16%
OFF
RRP  $116.00

RRP means 'Recommended Retail Price' and is the price our supplier recommends to retailers that the product be offered for sale. It does not necessarily mean the product has been offered or sold at the RRP by us or anyone else.

$98.60
or 4 easy payments of $24.65 with
afterpay
This item qualifies your order for FREE DELIVERY

Irrigated agriculture remains to be the main option to boost the economy in Sudan in general. It can rise the living standard of the majority of the population; particularly those who are attached to farming and livestock. With the expected increase in population in the next decades, water management of large irrigation systems will become a key issue to increase productivity and assure future food security.
Sediment transport in irrigation canals makes water management very complicated. This study focuses on water management in Gezira Scheme, Sudan. This scheme is irrigated from the Blue Nile River, which is characterized by a high sediment concentration. The aim of the study was to reduce the impact of fine sediment deposition in irrigation canals by improving the operation and maintenance procedures. A numerical model has been developed to simulate the cohesive sediment transport in irrigation canals. This model is a useful tool for the operators and decision makers to assess different options of operation in terms of sediment transport. This study found that sediment deposition in the canals can be minimized if the operation based on crop water requirement is adjusted at a certain period during the flood season.

ISBN:
9781138028807
9781138028807
Category:
Dams & reservoirs
Format:
Paperback
Publication Date:
17-10-2015
Language:
English
Publisher:
CRC Press LLC
Country of origin:
United States
Dimensions (mm):
240x171x13mm
Weight:
0.41kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 5 - 7 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Impact of Improved Operation and Maintenance on Cohesive Sediment Transport in Gezira Scheme.