Free shipping on orders over $99
Improving the Stability of Meshed Power Networks

Improving the Stability of Meshed Power Networks

A Probabilistic Approach Using Embedded HVDC Lines

by Robin Preece
Hardback
Publication Date: 11/11/2013

Share This Book:

  $204.98
or 4 easy payments of $51.24 with
afterpay
This item qualifies your order for FREE DELIVERY
The work in this thesis proposes the innovative use of modern technologies and mathematical techniques to analyse and control future power systems. It exploits new enabling technologies such as Voltage Source Converter High Voltage Direct Current (VSC-HVDC) lines, both single and multi-terminal, and Wide Area Measurement Systems (WAMS) to reduce the risks of instability associated with greater utilisation of modern power systems. New control systems for these technologies have been analysed, and subsequently designed, using advanced probabilistic analysis techniques to ensure that they are robust to the variable and turbulent conditions expected in the future.

The advanced probabilistic techniques used in the thesis for both system analysis and controller design represent one of the first such applications in open literature.
ISBN:
9783319023922
9783319023922
Category:
Power networks
Format:
Hardback
Publication Date:
11-11-2013
Language:
English
Publisher:
Springer International Publishing AG
Country of origin:
Switzerland
Pages:
188
Dimensions (mm):
235x155x13mm
Weight:
4.44kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro  2 working days

NSW Metro  2 working days

NSW Rural  2 - 3 working days

NSW Remote  2 - 5 working days

NT Metro  3 - 6 working days

NT Remote  4 - 10 working days

QLD Metro  2 - 4 working days

QLD Rural  2 - 5 working days

QLD Remote  2 - 7 working days

SA Metro  2 - 5 working days

SA Rural  3 - 6 working days

SA Remote  3 - 7 working days

TAS Metro  3 - 6 working days

TAS Rural  3 - 6 working days

VIC Metro  2 - 3 working days

VIC Rural  2 - 4 working days

VIC Remote  2 - 5 working days

WA Metro  3 - 6 working days

WA Rural  4 - 8 working days

WA Remote  4 - 12 working days

Reviews

Be the first to review Improving the Stability of Meshed Power Networks.