Free shipping on orders over $99
Intelligent Fixtures for the Manufacturing of Low Rigidity Components

Intelligent Fixtures for the Manufacturing of Low Rigidity Components

by Petr KolarH.-Christian Moehring Oscar Gonzalo and others
Hardback
Publication Date: 28/07/2017

Share This Book:

  $219.00
or 4 easy payments of $54.75 with
afterpay
This item qualifies your order for FREE DELIVERY
The book summarizes the results of the European research project "Intelligent fixtures for the manufacturing of low rigidity components" (INTEFIX). The structure of the book follows the sub-projects which are dedicated to case studies within the scenarios "vibrations", "deformations" and "positioning". The INTEFIX project deals with the development and analysis of several exemplary types of intelligent, sensor and actuator integrated fixtures for the clamping of sensitive workpieces in cutting machine tools. Thus, the book gives a representative overview about this innovative field of technology. The demands of the case studies are described and the technological approaches and solutions are introduced. Furthermore, innovative methods for the design and optimization of intelligent fixtures are presented.
ISBN:
9783319452906
9783319452906
Category:
Production engineering
Format:
Hardback
Publication Date:
28-07-2017
Publisher:
Springer International Publishing AG
Country of origin:
Switzerland
Pages:
183
Dimensions (mm):
235x155mm
Weight:
4.5kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Intelligent Fixtures for the Manufacturing of Low Rigidity Components.