Free shipping on orders over $99
Job Scheduling Strategies for Parallel Processing

Job Scheduling Strategies for Parallel Processing

21st International Workshop, JSSPP 2017, Orlando, FL, USA, June 2, 2017, Revised Selected Papers

by Walfredo CirneDalibor Klusacek and Narayan Desai
Paperback
Publication Date: 10/04/2018

Share This Book:

  $84.99
or 4 easy payments of $21.25 with
afterpay
This book constitutes the thoroughly refereed post-conference proceedings of the 21st International Workshop on Job Scheduling Strategies for Parallel Processing, JSSPP 2017, held in Orlando, FL, USA, in June 2017.The 10 revised full papers presented in this book were carefully reviewed and selected from 20 submissions. The papers cover topics in the fields of design and evaluation of new scheduling approaches; performance evaluation of scheduling approaches; workloads; consideration of additional constraints in scheduling systems; scaling and composition of very large scheduling systems; cloud provider issues; interaction between schedulers on different levels; interaction between applications/workloads; experience reports from production systems or large scale compute campaigns.
ISBN:
9783319773971
9783319773971
Category:
Software Engineering
Format:
Paperback
Publication Date:
10-04-2018
Publisher:
Springer International Publishing AG
Country of origin:
Switzerland
Pages:
189
Dimensions (mm):
235x155mm
Weight:
0.45kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Job Scheduling Strategies for Parallel Processing.