Stationary steam engines provided the power for the Industrial Revolution which changed the shape of the world. Victorian engines that have been preserved now provide the model engineer with examples to turn into fascinating models. This book provides the plans and instructions to make three models of actual steam engines. The projects have been designed around a set of common components. The first project is the simplest and will form the backbone for the manufacture of the other two, which are slightly more challenging and introduce some advanced techniques. The book is suitable for those with limited machining experience and a modestly equipped workshop, and has over 380 illustrations, including scale plans and colour photographs. AUTHOR: Stewart Hart is a trained tool maker and manufacturing engineer, with experience in product design and project engineering. With impending retirement, he set up a small home workshop to design and manufacture a range of model stationary engines, specialised tooling and 5" gauge model steam locomotives. 383 colour photographs
- ISBN:
- 9780719841200
- 9780719841200
-
Category:
- Model railways
- Format:
- Hardback
- Publication Date:
-
28-11-2022
- Language:
- English
- Publisher:
- The Crowood Press Ltd
- Country of origin:
- United Kingdom
- Pages:
- 176
- Dimensions (mm):
- 246x189x19mm
- Weight:
- 0.68kg
This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 3 - 5 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: