This book offers a comprehensive and practice-oriented guide to risk management, with a special emphasis on the physical and environmental risks related to the operations of railway systems. It is intended to provide a roadmap for managing the risk by controlling safety. Starting with a concise historical introduction and by presenting basic concepts of risk management, the book describes in turn the railway systems and their complexity. Then, it goes in depth into the process of risk management, describing the main elements, from risk identification, analysis and assessment to risk monitoring and communication. Different risk assessment techniques are reviewed in detail, and the main components of a risk management plan are presented. The book concludes with an introduction to health risk management, describing strategies for performing health risk assessments for staff in safety-critical positions. Based on the conviction that controlling safety is the main strategy in managing risk, and on the fact that the systems we would like to control are complex ones, this book provides transport and safety engineers with the necessary knowledge to effectively managing the risks of the railway system.
- ISBN:
- 9783030662653
- 9783030662653
-
Category:
- Highway & traffic engineering
- Format:
- Hardback
- Publication Date:
-
24-01-2021
- Publisher:
- Springer Nature Switzerland AG
- Country of origin:
- Switzerland
- Pages:
- 181
- Dimensions (mm):
- 235x155mm
- Weight:
- 0.48kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: