Natural draught cooling towers are inevitable for the economic generation of electricity under environmental aspects: In any thermal power plant heated stearn drives a turbogenerator, which produces the electric energy. In order to create an effective heat sink behind the turbine, the stearn is condensed and recyc led into the boiler. This requires a large amount of cooling water which is heated by running through the condensor. Even in the most efficient fossil fuel thermal (nuclear) power plants, only about 40 (30)% of the generated heat is turned in to electric energy. The rest of heat of 60 (70)% is discharged into the environment through the smokestack and the cooling wa ter circuit. To avoid thermal pollution of natural water resources the heated cooling water should be recooled artificially in a cooling sys tem and reused. Among all technical solutions natural draught cooling towers are effective, economic and widely spread cor rective measures. In large power plants only natural draught cooling towers are able to recover the immense quantities of water required for cooling. Thus only these engineering struc tures are able to balance environmental factors, economic in vestment and operating costs of the power station with the de mands of a reliable electric energy supply.
- ISBN:
- 9783642823473
- 9783642823473
-
Category:
- Alternative & renewable energy sources & technology
- Format:
- Paperback
- Publication Date:
-
08-12-2011
- Language:
- English
- Publisher:
- Springer-Verlag Berlin and Heidelberg GmbH & Co. KG
- Country of origin:
- Germany
- Pages:
- 548
- Dimensions (mm):
- 244x170x29mm
- Weight:
- 0.97kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 1 - 2 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: