Three speakers at the Second Workshop on Network Management and Control nostalgically remembered the INTEROP Conference at which SNMP was able to interface even to CD players and toasters. We agreed this was indeed a major step forward in standards, but wondered if anyone noticed whether the toast was burned, let alone, would want to eat it. The assurance of the correct operation of practical systems under difficult environments emerged as the dominant theme of the workshop with growth, interoperability, performance, and scalability as the primary sub-themes. Perhaps this thrust is un surprising, since about half the 100 or so attendees were from industry, with a strong contingency of users. Indeed the technical program co-chairs, Shivendra Panwar of Polytechnic and Walter Johnston of NYNEX, took as their assignment the coverage of real problems and opportunities in industry. Nevertheless we take it as a real indication of progress in the field that the community is beginning to take for granted the availability of standards and even the ability to detect physical, link, and network-level faults and is now expecting diagnostics at higher levels as well as system-wide solutions.
- ISBN:
- 9781489913005
- 9781489913005
-
Category:
- Electrical engineering
- Format:
- Paperback
- Publication Date:
-
26-06-2013
- Language:
- English
- Publisher:
- Springer-Verlag New York Inc.
- Country of origin:
- United States
- Pages:
- 514
- Dimensions (mm):
- 254x178x27mm
- Weight:
- 0.99kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 1 - 2 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: