Concrete floors should be diagnosed in order to obtain the proper durability. Non-destructive testing (NDT) methods, which have numerous advantages and are very effective for in situ testing, are recommended for this purpose. Non-Destructive Diagnostics of Concrete Floors: Methods and Case Studies offers useful NDT methods, test methodologies, and case studies. This book contains classifications of NDT methods, examines their areas of usefulness in floor diagnostics, and explains the complementarity and reliability of NDT methods as well as the need to calibrate research equipment. It presents interesting case studies of concrete floors, such as dowelled floors, floors with a top layer made of stone slabs, industrial floors, industrial floors with a top layer of polyurethane-cement, layered floors, post-tensioned floors, and cement screeds. The authors have drawn on many years of experience in both academia and the practical diagnosis of concrete floors using NDT methods.
- ISBN:
- 9781032264523
- 9781032264523
-
Category:
- Civil engineering
- Format:
- Hardback
- Publication Date:
-
08-08-2022
- Publisher:
- Taylor & Francis Ltd
- Country of origin:
- United Kingdom
- Pages:
- 148
- Dimensions (mm):
- 234x156mm
- Weight:
- 0.38kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: