Free shipping on orders over $99
Optimization of Power System Problems

Optimization of Power System Problems

Methods, Algorithms and MATLAB Codes

by Mahmoud Pesaran Hajiabbas and Behnam Mohammadi-Ivatloo
Hardback
Publication Date: 10/02/2020

Share This Book:

  $259.01
or 4 easy payments of $64.75 with
afterpay
This item qualifies your order for FREE DELIVERY
This book presents integrated optimization methods and algorithms for power system problems along with their codes in MATLAB. Providing a reliable and secure power and energy system is one of the main challenges of the new era. Due to the nonlinear multi-objective nature of these problems, the traditional methods are not suitable approaches for solving large-scale power system operation dilemmas. The integration of optimization algorithms into power systems has been discussed in several textbooks, but this is the first to include the integration methods and the developed codes. As such, it is a useful resource for undergraduate and graduate students, researchers and engineers trying to solve power and energy optimization problems using modern technical and intelligent systems based on theory and application case studies. It is expected that readers have a basic mathematical background.
ISBN:
9783030340490
9783030340490
Category:
Electrical engineering
Format:
Hardback
Publication Date:
10-02-2020
Publisher:
Springer Nature Switzerland AG
Country of origin:
Switzerland
Pages:
382
Dimensions (mm):
235x155mm
Weight:
0.76kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 1 - 2 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Optimization of Power System Problems.