This exceptionally produced trainee guide features a highly illustrated design, technical hints and tips from industry experts, review questions and a whole lot more! Key content includes: Plumbing Math Two, Reading Commerical Drawings, Structural Penetrations, Insulation, and Fire Stopping, Installing and Testing DWV Piping, Installing Roof, Floor, and Area Drains, Installing and Testing Water Supply Piping, Types of Valves, Installing Fixtures and Valves, Installing Water Heaters, Basic Electricity, and Fuel Gas and Fuel Oil Systems.
Instructor Supplements
Instructors: Product supplements may be ordered directly through OASIS at http://oasis.pearson.com. For more information contact your Pearson NCCER Sales Specialist at http://nccer.pearsonconstructionbooks.com/store/sales.aspx.
Instructor's Resource Card 978-0-13-340397-8
Trainee Guide Paperback + Access Card Package 978-0-13-340931-4
Access Card ONLY for Trainee Guide (does not include print book) 978-0-13-340392-3
ELECTRONIC Access Code ONLY for Trainee Guide (must be ordered electronically via OASIS; does not include print book) 978-0-13-340442-5
TestGen Software and Test Questions - Available for download from www.nccerirc.com. Access code comes in AIG and also available separately.
- ISBN:
- 9780133148503
- 9780133148503
-
Category:
- Plumbing
- Format:
- Paperback
- Publication Date:
-
14-08-2013
- Language:
- English
- Publisher:
- Pearson Education (US)
- Country of origin:
- United States
- Edition:
- 4th Edition
- Pages:
- 480
- Dimensions (mm):
- 10x10x10mm
- Weight:
- 0.93kg
This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 3 - 5 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: