The DC/AC microgrid system is a crucial empowering technology for the integration of various types of renewable energy sources (RES) accompanied by a smart control approach to enhance the system reliability and efficiency. This book presents cutting-edge technology developments and recent investigations performed with the help of power electronics. Large-scale renewable energy integration presents challenges and issues for power grids. In particular, these issues include microgrid adaption to RES, AC machines, the new configuration of AC/DC converters, and electrification of domestic needs with optimal cost expenses from domestic standalone microgrids. Furthermore, this book elaborates cutting-edge developments in electric vehicle fast charging configuration, battery management, and control schemes with renewable energies through hardware-in-loop testing and validation for performance durability in real-time application. Overall, the book covers the diverse field of microgrids, allowing readers to adopt new technologies and prepare for future power demands with sustainable green engineering.
- ISBN:
- 9783039364312
- 9783039364312
-
Category:
- Electrical engineering
- Format:
- Hardback
- Publication Date:
-
06-07-2020
- Publisher:
- Mdpi AG
- Pages:
- 276
- Dimensions (mm):
- 244x170x22mm
- Weight:
- 0.79kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 1 - 2 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: