Free shipping on orders over $99
Power Plant Engineering

Power Plant Engineering

Technical Papers by the Author

by Charles Bowman
Hardback
Publication Date: 26/10/2022

Share This Book:

  $138.51
or 4 easy payments of $34.63 with
afterpay
This item qualifies your order for FREE DELIVERY
During my 50+ years as a practicing Professional Engineer I have presented technical papers at various conferences and in technical publications. Many of these venues have been long since forgotten and most of these papers are no longer retrievable. In my opinion, some of these papers are worthy of preservation, as they have contributed to the advancement of the engineering of balance-of-plant mechanical systems in electric power plants. To remedy this situation, I offer this book containing my older papers. More recently (since about 2012) I have had my papers published by the ASME which required me to surrender copyright, so I cannot include them in this book. However, Appendix A contains a list of those papers which should be available from the ASME in perpetuity.
ISBN:
9781387519477
9781387519477
Category:
Nuclear power & engineering
Format:
Hardback
Publication Date:
26-10-2022
Language:
English
Publisher:
Lulu Press Inc.
Country of origin:
United States
Dimensions (mm):
279.4x215.9x16mm
Weight:
0.92kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Power Plant Engineering.