Railway refers to the system of transport that involves vehicles running on rails, which in turn are located on tracks. The connected series of rail vehicles is known as a train. Since the frictional resistance on rails is lower than rubber-tired vehicles, trains can be attached in a longer sequence. Railway transport can be powered either by electricity or produce their own power, mostly through a diesel engine. There are two major types of tracks which are used in railway systems - ballasted track and ballastless track. The various processes, which are a part of railway construction are laying bottom ballast, providing anchorage, laying steel rail, laying top ballast and installing rail anchor and rail brace. The topics included in this book on railway systems are of utmost significance and bound to provide incredible insights to readers. It is compiled in such a manner, that it will provide in-depth knowledge about the theory and practice of railway systems. This book will serve as a reference to a broad spectrum of readers.
- ISBN:
- 9781641726641
- 9781641726641
-
Category:
- Transport technology & trades
- Format:
- Hardback
- Publication Date:
-
08-03-2022
- Language:
- English
- Publisher:
- Larsen & Keller education
- Country of origin:
- United States
- Dimensions (mm):
- 276.35x203.2mm
This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 3 - 5 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: