This book focuses on some technical problems encountered in shield tunneling in hard-soft uneven stratum and extremely soft stratum, based on the recent shield tunneling engineering practice, and summarizes the achievements of shield tunneling in view of the technical problems from an overall and objective perspective. There are 6 chapters in this book. Chapter 1 introduces the development trend of shield tunneling method, defines classification of various stratum where shield tunneling applies, and mainly analyses the selection of shield machines and the configuration of cutters. Chapters 2 to 5 elaborates the strata characteristics and construction difficulties under various stratum conditions, puts forward adaptive selection and design keys of shield in various stratum, and emphatically analyses and summarizes the stability control technologies of shield tunnel face and driving control technology by case studies. Chapter 6 introduces the shield chamber opening technologies under hyperbaric condition, emphatically presents the basic requirements and operational preparations for the shield chamber opening, and puts forward innovative ideas of operation procedures, control points of key procedures, and safety requirements of shield chamber opening under hyperbaric condition.
- ISBN:
- 9789811613852
- 9789811613852
-
Category:
- Highway & traffic engineering
- Format:
- Paperback
- Publication Date:
-
12-07-2022
- Publisher:
- Springer Verlag, Singapore
- Country of origin:
- Singapore
- Pages:
- 348
- Dimensions (mm):
- 235x155mm
- Weight:
- 0.57kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: