Smart zero-energy buildings and communities have a major role to play in the evolution of the electric grid towards alignment with carbon neutrality policies. The goal to reduce greenhouse gas emissions in the built environment can be pursued through a holistic approach, including the drastic reduction of buildings' energy consumption.
The state-of-the-art in this field relates, on the one hand, to design methodologies and innovative technologies which aim to minimize the energy demand at the building level. On the other hand, the development of information and communication technologies, along with the integration of renewable energy and storage, provide the basis for zero and positive energy buildings and communities that can produce, store, manage and exchange energy at a local level.
This book provides a structured and detailed insight of the state-of-the-art in this context based on the analysis of real case studies and applications.
- ISBN:
- 9781786306845
- 9781786306845
-
Category:
- Electronics & communications engineering
- Format:
- Hardback
- Publication Date:
-
05-04-2022
- Language:
- English
- Publisher:
- John\Wiley#& Sons, Incorporated
- Country of origin:
- United States
- Dimensions (mm):
- 233.9x156x19.1mm
- Weight:
- 0.63kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: