Historically, black body radiation in the tungsten filament lamp was our primary industrial means for producing 'artificial' light, as it replaced gas lamps. Solid state luminescent devices for applications ranging from lamps to displays have proliferated since then, particularly owing to the develop ment of semiconductors and phosphors. Our lighting products are now mostly phosphor based and this 'cold light' is replacing an increasing fraction of tungsten filament lamps. Even light emitting diodes now chal lenge such lamps for automotive brake lights. In the area of information displays, cathode ray tube phosphors have proved themselves to be outstandingly efficient light emitters with excellent colour capability. The current push for flat panel displays is quite intense, and much confusion exists as to where development and commercialization will occur most rapidly, but with the need for colour, it is now apparent that solid state luminescence will play a primary role, as gas phase plasma displays do not conveniently permit colour at the high resolution needed today. The long term challenge to develop electroluminescent displays continues, and high performance fluorescent lamps currently illuminate liquid crystal monochrome and colour displays. The development of tri component rare earth phosphors is of particular importance.
- ISBN:
- 9789401046640
- 9789401046640
-
Category:
- Mechanics of solids
- Format:
- Paperback
- Publication Date:
-
20-09-2012
- Language:
- English
- Publisher:
- Springer
- Country of origin:
- Netherlands
- Pages:
- 386
- Dimensions (mm):
- 235x155x20mm
- Weight:
- 0.61kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: