Wetlands are very sensitive and valuable ecosystems that are subject to much stress from human activities. The study presented here has developed an innovative triple layer framework for analysis of wetland management. This approach provides support for spatial matching between physical planning, hydrological and ecological processes, and economic activities. The authors describe how integrated modelling at the regional scale can be achieved in practice. Following an introduction to wetlands, theoretical aspects of the contributing disciplines are discussed, as well as various aspects of integrated and spatial modelling. An applied integrated assessment of spatial wetland management for the Vecht area between Amsterdam and Utrecht is then presented. This assessment has resulted in a set of linked hydrological, ecological and economic models, formulated at the level of grids and polders, and various types of evaluations and rankings of scenarios. The results indicate the value of maintaining spatial detail for as long as possible.
- ISBN:
- 9781107405110
- 9781107405110
-
Category:
- Environmental science
- Format:
- Paperback
- Publication Date:
-
19-07-2012
- Language:
- English
- Publisher:
- Cambridge University Press
- Country of origin:
- United Kingdom
- Pages:
- 254
- Dimensions (mm):
- 244x170x13mm
- Weight:
- 0.41kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: