This volume presents twelve case studies that use RAISE - Rigorous Approach to Industrial Software Engineering - to construct, analyse, develop and apply formal specifications. The case studies cover a wide range of application areas including government finance, case-based reasoning, multi-language text processing, object-oriented design patterns, component-based software design and natural resource management. By illustrating the variety of uses of formal specifications, the case studies also raise questions about the creation, purpose and scope of formal models before they are built. Additional resources and complete specifications for all of the case studies and the RAISE tools used to process them, are available on the World Wide Web. This book will be of particular interest to software engineers, especially those responsible for the initial stages of requirements engineering and software architecture and design. It will also be of interest to academics and students on advanced formal methods courses.
- ISBN:
- 9781852333591
- 9781852333591
-
Category:
- Software Engineering
- Format:
- Paperback
- Publication Date:
-
08-02-2002
- Language:
- English
- Publisher:
- Springer London Ltd
- Country of origin:
- United Kingdom
- Pages:
- 405
- Dimensions (mm):
- 235x155x21mm
- Weight:
- 1.31kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 1 - 2 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: