The author, Fred Kerr, was introduced to the world of industrial railways in 1956 when his parents moved from Edinburgh to Corby in Northamptonshire, where the local steelworks offered a mix of locomotives from several manufacturers. When steam traction finished on BR in August 1968, Fred's interest in railways continued with diesel and electric traction, whilst retaining a passing interest in industrial locomotives through his visits to the heritage lines which were initiated in the post-Beeching era.
When the author converted to digital photography in 2001, he visited many heritage lines as he sought to gain experience in the digital world. When he looked back after a decade of digital photography, he noted that industrial locomotives were still at work on many heritage lines throughout the UK. He also noted that during the 1960s the effort to preserve mainline steam traction had overlooked the availability of industrial locomotives, leading to the scrapping of many locomotives with both a story to tell and an incomplete working life.
The result is a book that pays tribute to industrial locomotives which are still at work by detailing the manufacturers of these workhorses and the locomotives which they built; identifying their working lives where possible; showing their entry into preservation and paying tribute to those heritage lines which appreciated the value of these unsung heroes of the Industrial Revolution by buying the 'scrap' locomotives then restoring them to working order.
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: