Free shipping on orders over $99
Street Drainage Design and Modeling

Street Drainage Design and Modeling

by James C. Y. Guo
Paperback
Publication Date: 15/08/2017

Share This Book:

  $215.50
or 4 easy payments of $53.87 with
afterpay
This item qualifies your order for FREE DELIVERY

The objective of street stormwater drainage design is to warrant efficient and safe traffic movements during the severe storm events. This book is dedicated to the latest developments in: (a) new concepts to analyze the urban catchment hydrology for storm runoff predictions, (b) innovative methods to estimate the street allowable capacities to convey storm runoff, and (c) useful computer models to simulate flow movements in inlets and sewers.

- An excellent textbook for senior designs in Civil Engineering
- A useful technical book for Public Works and Urban Infrastructure,
- Good reviews of street hydraulics for Urban Drainage
- Revised Rational Method for urban catchment analysis,
- New concepts of street flow modeling with consideration of safety,
- Improved methods for street inlet sizing and storm sewer designs, and
- Efficient computer programming and models for sewer system flow analyses, and
- Excel tools using Excel spreadsheets and workbook approaches.

ISBN:
9781887201919
9781887201919
Category:
Economic systems & structures
Format:
Paperback
Publication Date:
15-08-2017
Language:
English
Publisher:
Water Resources Publications, LLC
Country of origin:
United States
Dimensions (mm):
279.4x215.9x8.64mm
Weight:
0.38kg

This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review Street Drainage Design and Modeling.