In Japan, as a large number of sewer lines approach and exceed their design service life, rehabilitation of these ageing sewers to ensure their safe operation and upgrade their functions gains urgence. In this pioneering work, Z. Shi, M. Nakano and Y. Takahashi present a systematic treatment of structural analysis and renovation design of ageing sewers as semi-composite pipes, including testing and construction guidelines. The concept of a semi-composite pipe and the application of fracture mechanics of concrete in numerical modelling are the two distinctive features of the established design theories, which have been employed for sewer renovation in Japan for more than 20 years, with the total length of renovation construction now exceeding 700 km. The leading authors have engaged in designing the renovation of ageing sewers since the mid 1990s, and the book will become a valuable reference work for sewer engineers worldwide, and academics and students in civil, urban and architectural engineering departments.
- ISBN:
- 9783110471731
- 9783110471731
-
Category:
- Engineering: general
- Age range:
- 22+ years old
- Format:
- Hardback
- Publication Date:
-
22-02-2016
- Language:
- English
- Publisher:
- Walter\de Gruyter#GmbH
- Country of origin:
- Germany
- Dimensions (mm):
- 240x170mm
- Weight:
- 0.93kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: