Free shipping on orders over $99
Sustainable Gold Mining Wastewater Treatment by Sorption Using Low-Cost Materials

Sustainable Gold Mining Wastewater Treatment by Sorption Using Low-Cost Materials

UNESCO-IHE PhD Thesis

by Mike Agbesi Acheampong
Paperback
Publication Date: 18/10/2013

Share This Book:

16%
OFF
RRP  $175.00

RRP means 'Recommended Retail Price' and is the price our supplier recommends to retailers that the product be offered for sale. It does not necessarily mean the product has been offered or sold at the RRP by us or anyone else.

$148.50
or 4 easy payments of $37.12 with
afterpay
    Please Note: We will source your item through a special order. Generally sent within 120 days.
This item qualifies your order for FREE DELIVERY
Sorption technique was employed to remove heavy metals from gold mining effluent using natural and plant materials for sustainability. An assessment of the effluent quality of a gold mining company in Ghana indicated that arsenic, copper and cyanide were the major pollutants in the process effluent. Arsenic and copper were successfully removed from the effluent by the studied materials. The research showed that the down-flow fixed-bed treatment configuration is an ideal system for the simultaneous removal of copper and arsenic from low concentration gold mining effluent, in addition to other heavy metals present in very low concentrations.
ISBN:
9781138001657
9781138001657
Category:
Hydrology & the hydrosphere
Format:
Paperback
Publication Date:
18-10-2013
Language:
English
Publisher:
Taylor & Francis Ltd
Country of origin:
United Kingdom
Pages:
180
Dimensions (mm):
241x168x13mm
Weight:
0.34kg

Our Australian supplier has this title on order. You can place a backorder for this title now and we will ship it to you when it becomes available. 

While we are unable to provide a delivery estimate, most backorders will be delivered within 120 days. If we are informed by our supplier that the title is no longer available during this time, we will cancel and refund you for this item.  Likewise, if no delivery estimate has been provided within 120 days, we will contact our supplier for an update.  If there is still no delivery estimate we will then cancel the item and provided you with a refund.

If we are able to secure you a copy of the title, our supplier will despatch it to our Sydney warehouse.  Once received we make sure it is in perfect condition and then despatch it to you via the Australia Post eParcel service, which includes online tracking.  You will receive a shipping notice from us when this occurs.

Reviews

Be the first to review Sustainable Gold Mining Wastewater Treatment by Sorption Using Low-Cost Materials.