Free shipping on orders over $99
The Electrical Contact of the Pantograph-Catenary System

The Electrical Contact of the Pantograph-Catenary System

Theory and Application

by Guangning WuGuoqiang Gao Wenfu Wei and others
Hardback
Publication Date: 14/07/2019

Share This Book:

  $169.00
or 4 easy payments of $42.25 with
afterpay
This item qualifies your order for FREE DELIVERY
This book covers the basic scientific theory and related application technologies of the pantograph-catenary system, including research findings on pantograph/catenary contact resistance, pantograph interface thermal effect, laws and characteristics of current-carrying friction and wear, the main research methods for pantograph arcs, the effects of arcs on pantograph systems and onboard equipment, and the materials used for pantographs and contact wires. Given its scope, it offers a valuable resource for students, scholars, and development engineers alike.

The relationship between pantograph and catenary is one of the three core aspects of the safe operation of high-speed electrified railways. The pantograph system provides electric power for the high-speed train through the sliding electric contact. As the train's operating speed increases, the pantograph system enters a state of prolonged sliding/vibration, resulting in frequent arcs, electrode erosion, and increased wear.
ISBN:
9789811365881
9789811365881
Category:
Highway & traffic engineering
Format:
Hardback
Publication Date:
14-07-2019
Publisher:
Springer Verlag, Singapore
Country of origin:
Singapore
Pages:
278
Dimensions (mm):
235x155mm
Weight:
0.6kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review The Electrical Contact of the Pantograph-Catenary System.