Free shipping on orders over $99
The Kuroshio Power Plant

The Kuroshio Power Plant

by Falin Chen
Hardback
Publication Date: 19/08/2013

Share This Book:

  $169.00
or 4 easy payments of $42.25 with
afterpay
This item qualifies your order for FREE DELIVERY
By outlining a new design or the Kuroshio power plant, new approaches to turbine design, anchorage system planning, deep sea marine engineering and power plant operations and maintenance are explored and suggested. The impact on the local environment, particularly in the face of natural disasters, is also considered to provide a well rounded introduction to plan and build a 30MW pilot power plant.



Following a literature review, the six chapters of this book propose a conceptual design by focusing on the plant's core technologies and establish the separate analysis logics for turbine design and the relay platforms. This is tempered against the ecological impact of both the construction and operation of the plant.



These proposed technologies and plans can be further applied to power generation in other waters such as the Gulf Stream, the East Australian Current the Humboldt Current and the East Africa Coastal Current. Engineers, students and industry professionals are provided with a solid introduction to power plant technology as well as a design with specific real world applications
ISBN:
9783319008219
9783319008219
Category:
Alternative & renewable energy sources & technology
Format:
Hardback
Publication Date:
19-08-2013
Language:
English
Publisher:
Springer International Publishing AG
Country of origin:
Switzerland
Pages:
225
Dimensions (mm):
235x155x14mm
Weight:
4.85kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review The Kuroshio Power Plant.