In Thermal and Power Management of Integrated Circuits, power and thermal management issues in integrated circuits during normal operating conditions and stress operating conditions are addressed. Thermal management in VLSI circuits is becoming an integral part of the design, test, and manufacturing. Proper thermal management is the key to achieve high performance, quality and reliability. Performance and reliability of integrated circuits are strong functions of the junction temperature. A small increase in junction temperature may result in significant reduction in the device lifetime.
This book reviews the significance of the junction temperature as a reliability measure under nominal and burn-in conditions. The latest research in the area of electro-thermal modeling of integrated circuits will also be presented. Recent models and associated CAD tools are covered and various techniques at the circuit and system levels are reviewed. Subsequently, the authors provide an insight into the concept of thermal runaway and how it may best be avoided. A section on low temperature operation of integrated circuits concludes the book.
- ISBN:
- 9780387257624
- 9780387257624
-
Category:
- Circuits & components
- Format:
- Hardback
- Publication Date:
-
04-01-2006
- Language:
- English
- Publisher:
- Springer-Verlag New York Inc.
- Country of origin:
- United States
- Pages:
- 182
- Dimensions (mm):
- 235x155x12mm
- Weight:
- 0.99kg
This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: