Free Shipping on Order Over $80
AfterPay Available
Waterflooding Facilities and Operations

Waterflooding Facilities and Operations

by Dave Chappell
Paperback
Publication Date: 29/10/2020
RRP  $66.00 $65.75
Although the design of waterflood facilities clearly lies within the realm of the engineering function, it is vitally important that there is an integration with staff from all relevant disciplines so that the facility meets project requirements for the full life cycle of the field. The subsurface and surface systems are intrinsically interlinked, and it must not be forgotten that the installed facility must be operable, so it is critical to involve the operations function throughout the design process. Waterflooding Facilities and Operations looks at the design of injection and production systems in a waterflood context and the various pieces of equipment that might feature in the designs, how they interface with the required chemical-injection programs, and how they are operated.
ISBN:
9781613998106
9781613998106
Category:
Petroleum technology
Format:
Paperback
Publication Date:
29-10-2020
Publisher:
Society of Petroleum Engineers
Pages:
128
Dimensions (mm):
229x152x9mm
Weight:
0.24kg

This title is in stock with our Australian supplier and arrives at our Sydney warehouse within 10-15 working days of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro  2 working days

NSW Metro  2 working days

NSW Rural  2 - 3 working days

NSW Remote  2 - 5 working days

NT Metro  3 - 6 working days

NT Remote  4 - 10 working days

QLD Metro  2 - 4 working days

QLD Rural  2 - 5 working days

QLD Remote  2 - 7 working days

SA Metro  2 - 5 working days

SA Rural  3 - 6 working days

SA Remote  3 - 7 working days

TAS Metro  3 - 6 working days

TAS Rural  3 - 6 working days

VIC Metro  2 - 3 working days

VIC Rural  2 - 4 working days

VIC Remote  2 - 5 working days

WA Metro  3 - 6 working days

WA Rural  4 - 8 working days

WA Remote  4 - 12 working days

Customer Reviews

Be the first to review Waterflooding Facilities and Operations.